Penerapan Manpower Planning (MPP) dan Full Time Equivalent (FTE) pada Bagian Produksi PT. Lampung Sukses Bersama (Lampung Banana Foster)

Authors

  • Tia Riski Rahmadhani Program Studi Matematika, Fakultas Sains, Institut Teknologi Sumatera, Lampung Selatan, 35365
  • Eristia Arfi Program Studi Matematika, Fakultas Sains, Institut Teknologi Sumatera, Lampung Selatan, 35365

DOI:

https://doi.org/10.22437/msa.v4i2.32291

Keywords:

Manpower Planning (MPP), Full Time Equivalent (FTE)

Abstract

PT. Lampung Sukses Bersama, commonly known as Lampung Banana Foster, is a specialized retail establishment dedicated to promoting indigenous Nusantara products, particularly those hailing from the Lampung region. The core values of Lampung Banana Foster revolve around ensuring top-notch product quality, premium service, and a modern aesthetic. In line with its organizational strategy, it places significant emphasis on the importance of effective human resource management. Through empirical research, a noticeable misalignment between available human resources and actual production output has been uncovered. The research data, focuses on the production output of the production department from April to June 2020, coinciding with the emergence of the Covid-19 pandemic and its consequential impacts on business operations. Analysis of this dataset highlights a significant disparity between employee headcount and Full-Time Equivalent (FTE) value. Using the framework of Manpower Planning (MPP), the study reveals that shortages in employee numbers vary on a monthly basis. Consequently, we suggest that augmenting the workforce through new employee recruitment is necessary to ensure an equitable distribution of workload among all staff members. This finding underscores the importance of strategic human resource interventions to maintain operational efficiency and organizational resilience amidst changing circumstances.

Downloads

Download data is not yet available.

References

Yudha, I.P.,, Widiastini, N.M., and Rahmawati, P.I., 2023. Strategi Pengelolaan Sumber Daya Manusia Pada proyek Konstruksi Villa di provinsi Bali. Publik: Jurnal Manajemen Sumber Daya Manusia, Administrasi dan Pelayanan Publik, 10(2), 646–654. https://doi.org/10.37606/publik.v10i2.701.

N, M. G. A., & Prasetya, A. 2017. Efektivitas manpower planning dengan menggunakan metode analisis beban kerja (work load analysis) berdasarkan pendekatan full time equivalent. Jurnal Administrasi Bisnis, 42(1), 27–35.

Anggraini, R.I.,, Sudarnika, E.,, Pisestyani, H.,, Wicaksono, A., and Sudarwanto, M. 2020. Manpower planning in the application of teat dipping to control sub clinical mastitis in the small dairy farms. Jurnal Manajemen dan Agribisnis, 17(1), 26-32. https://doi.org/10.17358/jma.17.1.26.

Muhardiansyah, H. & Widharto, Y. 2018. Workload analysis dengan metode full time equivalent (fTE) untuk menentukan kebutuhan tenaga kerja pada dept. Produksi unit betalactam PT. Phapros, TBK. Industrial Engineering Online Journal, 6(4), 1-8.

Kabul, E. R., & Febrianto, M. N. 2022. Implementasi Metode Full Time Equivalent (FTE) Dalam Analisis Kebutuhan Tenaga Kerja. Ikraith-Ekonomika, 5(1), 162-168.

Matiro, M. A. D., Mau, R. S., Rasyid, A., & Rauf, F.A. 2021. Pengukuran Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Pada Divisi Proses PT. Delta Subur Permai. Jambura Industrial Review, 1(1), 30-39.

Downloads

Published

2024-04-30

How to Cite

Rahmadhani, T. R. ., & Arfi, E. (2024). Penerapan Manpower Planning (MPP) dan Full Time Equivalent (FTE) pada Bagian Produksi PT. Lampung Sukses Bersama (Lampung Banana Foster). Mathematical Sciences and Applications Journal, 4(2), 78-82. https://doi.org/10.22437/msa.v4i2.32291