[1]
Rahmadhani, T.R. and Arfi, E. 2024. Penerapan Manpower Planning (MPP) dan Full Time Equivalent (FTE) pada Bagian Produksi PT. Lampung Sukses Bersama (Lampung Banana Foster). Mathematical Sciences and Applications Journal. 4, 2 (Apr. 2024), 78-82. DOI:https://doi.org/10.22437/msa.v4i2.32291.