1.
Harmes H. Penerapan Metode Nilai Hasil terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control. Jur. Engineer [Internet]. 2024 Feb. 29 [cited 2025 May 13];6(1):38-46. Available from: https://online-journal.unja.ac.id/JurnalEngineering/article/view/41997