Harmes, Harmes. “Penerapan Metode Nilai Hasil Terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu Dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control”. Jurnal Engineering 6, no. 1 (February 29, 2024): 38–46. Accessed March 5, 2025. https://online-journal.unja.ac.id/JurnalEngineering/article/view/41997.