[1]
H. Harmes, “Penerapan Metode Nilai Hasil terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control”, Jur. Engineer, vol. 6, no. 1, pp. 38–46, Feb. 2024.