Harmes, H. (2024) “Penerapan Metode Nilai Hasil terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control”, Jurnal Engineering, 6(1), pp. 38–46. Available at: https://online-journal.unja.ac.id/JurnalEngineering/article/view/41997 (Accessed: 5March2025).