Harmes, H. (2024). Penerapan Metode Nilai Hasil terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control. Jurnal Engineering, 6(1), 38–46. Retrieved from https://online-journal.unja.ac.id/JurnalEngineering/article/view/41997