[1]
Harmes, H. 2024. Penerapan Metode Nilai Hasil terhadap Evaluasi Kinerja Proyek: Studi Pengendalian Waktu dan Biaya: The Application of the Earned Value Method in Project Performance Evaluation: A Study on Time and Cost Control. Jurnal Engineering. 6, 1 (Feb. 2024), 38–46.